7.3 Prediction of rock burst

    7.3.1 The geological factors causing rock burst shall be studiedbased on lithology and rock mass strength, rock mass structuralcharacteristic and integrity, geostress magnitude and direction, andgroundwater active condition aspects.7.3.2 The calculation o...[繼續(xù)閱讀]

水電水利工程地下工程地質(zhì)勘察

7.4 Prediction of water gushing and mud eruption

    7.4.1 Water gushing prediction shall be made based on thehydro-geological condition of the underground works, therelationship between the factors such as groundwater table, synclinewater collecting structure, fault fractured zone and influenced zone,joint...[繼續(xù)閱讀]

水電水利工程地下工程地質(zhì)勘察

7.5 Prediction of ground temperature, hazardous

    gas and radioactivity7.5.1 Ground temperature prediction may be conducted with thefollowing methods.(1) The data of regional ground temperature geothermal, groundtemperature gradient value and ground surface mean annual averagetemperature value shall be c...[繼續(xù)閱讀]

水電水利工程地下工程地質(zhì)勘察

7.6 Prediction of external water pressure

    7.6.1 The following contents shall be analyzed and studied forprediction of the external water pressure.(1) The stratigraphy and lithology, geological structure, rock masspermeability, groundwater activity, groundwater table, supply, runoff,and discharge ...[繼續(xù)閱讀]

水電水利工程地下工程地質(zhì)勘察

7.7 Engineering geological assessment on surrounding rock stability of high water head pressure tunnel

    7.7.1 In the assessment of surrounding rocks stability of steel linedtunnel, unit elastic resistance coefficient shall be adopted to assess thecapacity of resisting the radial direction deformation, in case thesurrounding rocks cannot totally bear the inn...[繼續(xù)閱讀]

水電水利工程地下工程地質(zhì)勘察

7.8 Engineering geological assessment on surrounding rocks stability of aircushion surge chamber

    7.8.1 The engineering geological assessment content and methodof the surrounding rocks stability with shotcrete anchorage support orconcrete lined aircushion surge chamber shall meet the requirement in7.7.2.7.8.2 The design air pressure of the aircushion ...[繼續(xù)閱讀]

水電水利工程地下工程地質(zhì)勘察

8.1 lnvestigation on specific engineering geological problems

    8.1.1 The investigation of the technicality engineering geologicalproblem shall be carried out on approved feasibility study report, andthe specific engineering geological problems proposed by review offeasibility study report shall be demonstrated. The s...[繼續(xù)閱讀]

水電水利工程地下工程地質(zhì)勘察

8.2 Construction geological works

    8.2.1 The construction geological work include two stages,excavation period and final cross section period. When full sectionconstruction is adopted, the work may be finished once.8.2.2 The construction geological work in excavation period shallinclude th...[繼續(xù)閱讀]

水電水利工程地下工程地質(zhì)勘察

8.3 Geological works in surrounding rocks treatment

    8.3.1 Based on the rechecked engineering geological classificationof surrounding rocks, the advice on support adjustment shall beproposed.8.3.2 According to the unfavorable combination of thediscontinuity, the advice on local reinforcement treatment of th...[繼續(xù)閱讀]

水電水利工程地下工程地質(zhì)勘察

8.4 Geological works for surrounding rocks monitoring

    8.4.1 Based on the geological conditions and stability ofsurrounding rocks disclosed in construction excavation, the opinionand advice on the deformation monitoring shall be proposed.8.4.2 Surrounding rocks monitoring should include the followingcontents....[繼續(xù)閱讀]

水電水利工程地下工程地質(zhì)勘察
科普知識(shí)
心理健康 優(yōu)生優(yōu)育 休閑旅游 健身美容 飲食健康 人與自然 地球家園 海洋技術(shù) 科海拾貝 科學(xué)之迷 科技前沿 科技史話 科幻未來 神話傳說 童話故事 致富指南 農(nóng)用物資 生物技術(shù) 畜牧獸醫(yī) 園林花卉 特產(chǎn)養(yǎng)殖 營養(yǎng)早餐 減肥晚餐 晚餐食譜 營養(yǎng)晚餐 減肥中餐 中餐文化 中餐菜譜 中餐營養(yǎng) 健康早餐 減肥早餐 早餐食譜 晚餐禁忌 寶石鑒定 安全生產(chǎn) 安裝鉗工 鈑金技術(shù) 寶石觀察 焙烤工業(yè) 變性淀粉 插花技能 車工技術(shù) 道路工程 低壓電器 電氣工程 電氣設(shè)備 電網(wǎng)工程 電源技術(shù) 電站工程 淀粉科學(xué) 調(diào)味配方 發(fā)電節(jié)能 防水材料 飛機(jī)飛行 服裝生產(chǎn) 鋼鐵材料 工程建設(shè) 工業(yè)工程 公路工程 管道工程 罐頭工業(yè) 國際組織 國家電網(wǎng) 華北電網(wǎng) 火電工程 貨運(yùn)物流 機(jī)床設(shè)計(jì) 機(jī)電工程 機(jī)修鉗工 基本資料 家用電器 建設(shè)工程 節(jié)約用電 金銀技術(shù) 金屬材料 連續(xù)鑄鋼 輪機(jī)工程 奶牛養(yǎng)殖 農(nóng)村電工 配電技術(shù) 皮革工業(yè) 啤酒工業(yè) 蘋果產(chǎn)業(yè) 鉗工簡明 青工車工 青年審美 肉類工業(yè) 入侵檢測 食品科學(xué) 世界修船 獸醫(yī)獸藥 水下工程 稅收制度 通信設(shè)備 統(tǒng)計(jì)公文 土木工程 維修電工 味精工業(yè) 文物鑒賞 物業(yè)電工 銑工計(jì)算 線損管理 鞋楦設(shè)計(jì) 煙草工業(yè) 鹽業(yè)產(chǎn)品 冶金產(chǎn)品 液壓技術(shù) 印刷科技 用電管理 油墨技術(shù) 軋鋼技術(shù) 粘接技術(shù) 照明設(shè)計(jì) 制漿造紙 土元養(yǎng)殖 兔場疾病 外國美術(shù)