6.3.1 Arrangement of auxiliary powerhouse shall be determined based upon the overall project planning and combined withgeneral layout conditions. The auxiliary powerhouse of a surfacepowerhouse may be built at upstream side,downstream side orany end of th...[繼續(xù)閱讀]